Oakland University Projects

Client
Oakland University

Location
Rochester, Michigan

Services
Civil Engineering
Surveying

Completion Date
Ongoing

Giffels Webster has worked with Oakland University over several decades on numerous projects. The following project list was compiled to demonstrate the wide variety of services Giffels Webster has provided and represents only a portion of the work completed over the years.

Engineering Services

  • Graham Health Center Parking Lot
  • Hannah Hall of Science South Truck Dock
  • Shotwell-Gustafson Pavilion South Drop-off Loop
  • Main Entrance Drive at Meadow Brook Circle
  • Entrance Approaches and Main Circle
  • Service Area Improvements at Various Locations
  • Proposed Sanitary Sewer to Clubhouse
  • Squirrel Road Improvements
  • Storm Drain Improvements to Athletic Field
  • Sanitary Sewer Plan for Child Care Center
  • Meadowbrook and Adams Road Intersection
  • Library Expansion
  • Foundation Drive and Meadowbrook Drive
  • Water Main/Storm Sewer for Married Student Housing

Surveying Services

  • Master Topo for Total Site
  • Aerial Photo Registration
  • Topo at Baldwin Pavilion
  • Safety Services Topo
  • Recreation Area Drainage
  • Lot Topo and Lot Study at Mead and Squirrel
  • Topo at Walton Road (entrances for gates)
  • Topo at Quadrangle (library mall)
  • South Walkway Topos at Vanderberg Hall to Health Center

Studies and Reports

  • Route Study for Sanitary Sewer
  • Water Supply and Connector Study
  • Road Study and Plan for Kettering Lab
  • Preliminary Residential Plan and Estimate
  • Water System Study