Giffels Webster was selected to perform the design, bidding, and construction of approximately 6,500 linear feet of 8-foot-wide sidewalk, drive approaches, and ADA ramps along 21 Mile Road and Heydenreich road in Macomb Township. Giffels Webster provided additional services that included surveying, construction layout, inspection, permitting, and contract administration for the project.
Giffels Webster assisted the township in the negotiation of easements with property owners and designing for their special conditions. In the design and construction phase, Giffels Webster worked with property owners to keep them notified of ongoing work and fulfilling their needs. ADA ramps were installed throughout the project at all roadway crossings. The sidewalk was constructed within the limits of existing developments with drainage improvements where required. The existing roadway and properties had significant drainage problems that required extensive engineering without the ability to regrade properties outside of the right-of-way.
The 10-year infill project was planned throughout the township to connect existing sidewalks to allow pedestrian traffic along major thoroughfares. The entire project was phased based on need (proximity to schools, parks, and other major pedestrian traveled locations) and budget. These sidewalks encourage safe pedestrian connectivity throughout the township.