The development of an existing 8.5-acre industrial lot with two additional parking lot expansions was due to business operations growing over 8 years. The Giffels Webster team developed the site around the existing ITC overhead wires and two 36” high-pressure gas mains that traverse it. The development also encompassed an existing cul-de-sac and the existing utilities within the old cul-de-sac were to remain to service the proposed building and future sites to the north and west. Site programming included required parking, sanitary lead, a new looping water main, and a storm sewer connecting to an existing regional detention system. The landscape design for the site included providing required street-side berms and landscaping per the zoning ordinance.
America Expedition Vehicles
Lyon, Michigan
Civil Engineering
Landscape Architecture
Surveying
2024
Office/Industrial
Giffels Webster provided construction staking for utilities and deformation monitoring for sewer crossings at the US Port of Entry for the Gordie Howe International Bridge, ensuring precise installation and documentation under I-75.
Giffels Webster provided construction staking and positional monitoring for Detroit’s J.L. Hudson’s Site redevelopment, ensuring precise horizontal and vertical control across 12 Block Building floors and 49 Tower floors in this mixed-use project.
Revitalization of downtown Grand Ledge with enhanced public spaces, seating, landscaping, and accessibility improvements, supported by MEDC RAP funding and designed by Giffels Webster to boost community engagement and event flexibility.
Projects
Have a project in mind? Our team is ready to collaborate and deliver solutions that align with your goals. Reach out to learn how we can help bring your vision to life.
Start Your ProjectHave a project in mind? Our team is ready to collaborate and deliver solutions that align with your goals. Reach out to learn how we can help bring your vision to life.
Start Your Project